Home/When should a Risk Control Plan be developed?

During a health inspection, if a violation is observed, it is documented on the report with a corrective action. If an isolated occurrence, the violation is corrected by the operator and not repeated.

A risk control plan is implemented when a hazard is uncontrolled and has the potential for being continuous or chronic. The plan should provide for clear, measurable success.

2018-09-04T09:46:26-07:00
Skip to content